Deployment & Commissioning
Installation, configuration, integration and commissioning with a test record. The system is only considered delivered once validated against the requirement that originated the purchase — not once powered on.
What is delivered
What is delivered
Evidence of delivery
Signed commissioning protocol, as-built drawings and configuration documentation.
- Deployment plan with maintenance window and rollback plan
- Physical installation and equipment configuration
- Integration with existing systems
- Completed functional test protocol (FAT/SAT)
- As-built documentation, credential handover and knowledge transfer
Scope
What's included
Each track is contracted on its own or combined. Whatever does not fit your operation stays out of scope — and out of the price.
Deployment plan
Sequence, window, rollback plan and acceptance criteria defined before the first box is opened.
Installation and physical infrastructure
Mounting, cable pulling, grounding, power and cooling — the layer that decides whether the rest lasts.
Configuration and integration
Equipment parameterization and integration with the systems already running, including the undocumented ones.
Legacy migration
Transition of what is in production with controlled coexistence and a rollback point at every stage.
Commissioning and test protocol
FAT and SAT completed against the requirement that originated the purchase. Without a signed protocol it is not delivered.
As-built and handover
Documentation of what was actually installed, credentials handed over and training for whoever will operate it.
Next step