Responsibility

Sustainability & Responsibility

Commitments and policies in force — stated as what they are, without dressing them up as results.

How to read this page

We distinguish four things that ESG communication usually blends together: a COMMITMENT is what we undertake; a POLICY is a written rule already in force; an INITIATIVE is action underway; a RESULT is a measured, verifiable figure. This page contains commitments, policies and initiatives. It publishes no results, because no measured series exists yet — and publishing an unmeasured figure would be greenwashing.

Environmental

Policy — electronic waste
Equipment replaced in a Noryvex project is not discarded as ordinary waste. It is returned to the client, sent back to the manufacturer through reverse logistics, or delivered to a licensed receiver, with the destination recorded.
Commitment — efficiency in specification
Size systems to the real requirement, not to the vendor’s comfort margin. Oversized equipment consumes energy and capital across its entire service life.
Initiative — extending service life
Prioritize integrating the installed base over replacing it when performance meets the requirement. It is the lowest-impact environmental decision and, almost always, the cheapest one.

Social

Commitment — local capability
Build technical capability in the region where we operate, rather than importing a crew for each project and leaving the client with nobody to run it afterwards.
Policy — occupational safety
Work at height, on energized panels or in confined spaces is performed only with the applicable procedure, protective equipment and authorization. Scope requiring a regulated attribution we do not hold is declined.

Governance

Policy — responsible procurement
Suppliers accept the Supplier Code published in this section. Product without traceable origin or regular tax documentation is not purchased.
Policy — privacy by design
Systems processing personal data — CCTV, access control, driver telemetry — have their purpose, legal basis and retention period declared at the specification stage, not after installation.

Questions about this document?

Get in touch